| Section 0001: PROPOSAL ITEMS |
| Line | Item | Alt | Description | Units | Price | Quantity |
| 0010 | 201.0105 | | CLEARING | STA | | 3.00000 |
| 0020 | 201.0205 | | GRUBBING | STA | | 3.00000 |
| 0030 | 203.0100 | | REMOVING SMALL PIPE CULVERTS | EACH | | 1.00000 |
| 0040 | 203.0200 | | REMOVING OLD STRUCTURE (STATION) 01. STA. 10+00 | LS | | 1.00000 |
| 0050 | 205.0100 | | EXCAVATION COMMON | CY | | 277.00000 |
| 0060 | 206.2000 | | EXCAVATION FOR STRUCTURES CULVERTS (STRUCTURE) 01. B-13-560 | LS | | 1.00000 |
| 0070 | 206.6000.S | | TEMPORARY SHORING | SF | | 1000.00000 |
| 0080 | 208.0100 | | BORROW | CY | | 83.00000 |
| 0090 | 210.0100 | | BACKFILL STRUCTURE | CY | | 410.00000 |
| 0100 | 213.0100 | | FINISHING ROADWAY (PROJECT) 01. 5993-00-72 | EACH | | 1.00000 |
| 0110 | 305.0110 | | BASE AGGREGATE DENSE 3/4-INCH | TON | | 45.00000 |
| 0120 | 305.0120 | | BASE AGGREGATE DENSE 1 1/4-INCH | TON | | 505.00000 |
| 0130 | 311.0110 | | BREAKER RUN | TON | | 385.00000 |
| 0140 | 455.0605 | | TACK COAT | GAL | | 20.00000 |
| 0150 | 465.0105 | | ASPHALTIC SURFACE | TON | | 155.00000 |
| 0160 | 504.0900 | | CONCRETE MASONRY ENDWALLS | CY | | 25.00000 |
| 0170 | 521.0771 | | PIPE ARCH CORRUGATED STEEL 71X47-INCH | LF | | 40.00000 |
| 0180 | 521.1271 | | APRON ENDWALLS FOR PIPE ARCH STEEL 71X47-INCH | EACH | | 2.00000 |
| 0190 | 523.0168 | | CULVERT PIPE REINFORCED CONCRETE HORIZONTAL ELLIPTICAL CLASS HE-III 68X106-INCH | LF | | 120.00000 |
| 0200 | 606.0300 | | RIPRAP HEAVY | CY | | 70.00000 |
| 0210 | 614.0620.S | | MARKER POSTS CULVERT END FLEXIBLE | EACH | | 2.00000 |
| 0220 | 619.1000 | | MOBILIZATION | EACH | | 1.00000 |
| 0230 | 625.0500 | | SALVAGED TOPSOIL | SY | | 1150.00000 |
| 0240 | 627.0200 | | MULCHING | SY | | 1650.00000 |
| 0250 | 628.1505 | | SILT FENCE DELIVERED | LF | | 600.00000 |
| 0260 | 628.1510 | | SILT FENCE INSTALLED | LF | | 600.00000 |
| 0270 | 628.1520 | | SILT FENCE MAINTENANCE | LF | | 1200.00000 |
| 0280 | 628.1905 | | MOBILIZATIONS EROSION CONTROL | EACH | | 2.00000 |
| 0290 | 628.1910 | | MOBILIZATIONS EMERGENCY EROSION CONTROL | EACH | | 2.00000 |
| 0300 | 628.2010 | | EROSION MAT DELIVERED CLASS I TYPE B | SY | | 50.00000 |
| 0310 | 628.3010 | | EROSION MAT INSTALLED CLASS I TYPE B | SY | | 50.00000 |
| 0320 | 628.7505 | | TEMPORARY DITCH CHECKS DELIVERED | LF | | 50.00000 |
| 0330 | 628.7510 | | TEMPORARY DITCH CHECKS INSTALLED | LF | | 50.00000 |
| 0340 | 629.0210 | | FERTILIZER TYPE B | CWT | | 1.20000 |
| 0350 | 630.0120 | | SEEDING MIXTURE NO. 20 | LB | | 44.00000 |
| 0360 | 630.0160 | | SEEDING MIXTURE NO. 60 | LB | | 5.00000 |
| 0370 | 630.0200 | | SEEDING TEMPORARY | LB | | 22.00000 |
| 0380 | 642.5000 | | FIELD OFFICE TYPE B (PROJECT) 01. 5993-00-72 | EACH | | 1.00000 |
| 0390 | 643.0100 | | TRAFFIC CONTROL (PROJECT) 01. 5993-00-72 | EACH | | 1.00000 |
| 0400 | 645.0105 | | GEOTEXTILE FABRIC TYPE C | SY | | 235.00000 |
| 0410 | 645.0120 | | GEOTEXTILE FABRIC TYPE HR | SY | | 175.00000 |
| 0420 | 650.4500 | | CONSTRUCTION STAKING SUBGRADE | LF | | 300.00000 |
| 0430 | 650.5000 | | CONSTRUCTION STAKING BASE | LF | | 300.00000 |
| 0440 | 650.6000 | | CONSTRUCTION STAKING PIPE CULVERTS | EACH | | 1.00000 |
| 0450 | 650.6500 | | CONSTRUCTION STAKING STRUCTURE LAYOUT (STRUCTURE) 01. B-13-560 | LS | | 1.00000 |
| 0460 | 690.0100 | | SAWING EXISTING PAVEMENT | LF | | 33.00000 |
| 0470 | SPV.0195 | | SPECIAL 01. BASE AGGREGATE DENSE 1 1/4-INCH OVERLAND ROUTE | TON | | 240.00000 |